Chesterfield County Unincorporated, Virginia · General provision
19.2-37 D.2.e
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Setback
- Petroleum pipeline setbackSetbackThe distance a building must be held back from a lot line.20 ft
all structures shall be set back 20 feet from any petroleum product transmission pipeline easement.
From the ordinance
Within a lot subdivision recorded on or after July 7, 1988, all structures shall be set back 20 feet from any petroleum product transmission pipeline easement.