Sec. 19.2-46
Dimensional standards
Servicing
- Applies near
- Swift Creek Reservoir
- Geographic extent
- Upper Swift Creek watershed
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Environmental
- Natural Resource Inventory required
An application for rezoning or conditional use in the Upper Swift Creek Watershed shall include a Natural Resource Inventory (NRI) for the proposed development site except as set forth below.
Other
- Post-development phosphorus load0.22 lbs/acreacre43,560 square feet — about the size of an American football field without the end zones./year
For any new use or development, the post-development, nonpoint-source pollution runoff loads of phosphorous shall not exceed 0.22 pounds per acre per year for the post-development total phosphorus load for residential uses subject to subdivision approval.
- Tree canopy requirement
All site plans and construction plans for subdivision plats shall include detailed landscape plans... to provide for the preservation, planting, and replacement of trees on-site to the extent that, at maturity of twenty years, the minimum tree canopy is as follows in Table 19.2-46.1
From the ordinance
For any new use or development, the post-development, nonpoint-source pollution runoff loads of phosphorous shall not exceed 0.22 pounds per acre per year for the post-development total phosphorus load for residential uses subject to subdivision approval.