Dimensional standards
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Exclusions from lot areaMinimum lot areaThe smallest parcel on which the district allows anything to be built. calculation
Land constituting tidal wetlands, land submerged under nontidal waters, land within an open drainage ditch excluded; up to 10% of min required lot area may be within such properties
- Combination of lots
When combining lots, all area, frontage, yard and other site requirements for each lot shall apply unless lot lines vacated
- Minimum lot frontageFrontageThe length of a lot line that touches a public street. as percentage of lot widthLot widthHow wide a lot must be, usually measured at the front setback line.80 pct
minimum of 80 percent of the minimum lot width for the zoning district
- Minimum lot frontageFrontageThe length of a lot line that touches a public street. for stormwater/open spaceOpen spaceLand a development must leave unbuilt, sometimes required to be usable or planted./conservation50 ft
minimum lot frontage for lots used exclusively for storm water management, open space or conservation shall be fifty (50) feet
From the ordinance
Lot frontage shall be measured along the street reservation line... minimum of 80 percent of the minimum lot width... minimum lot frontage for lots used exclusively for storm water management, open space or conservation shall be fifty (50) feet.