Extracted standards
8 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Decommissioning agreement required
Prior to approval of conditional use permit, applicant shall enter into written decommissioning agreement with city.
- Financial assurance required
Applicant shall provide financial assurance based on estimated decommissioning costs, in form of certified funds, cash escrow, bond, or irrevocable letter of credit.
- Layered fire protection required
Shall include sufficient layered fire protection approach as determined by Chesapeake Fire Department, including access, water sources, fire walls, monitoring, etc.
- Lighting limit at lot line0.5 footcandles
All onsite lighting shall be arranged so that direct or reflected illumination does not exceed one-half (0.5) footcandles above background measured at the lot line of any adjoining property.
- SetbackSetbackThe distance a building must be held back from a lot line. from property lines300 ft
Any battery energy storage system shall be setback three hundred (300) feet from all property lines.
- SetbackSetbackThe distance a building must be held back from a lot line. reduction possible100 ft
City council may reduce the distance to no less than one hundred (100) feet if independent risk analysis provided and safety features identified.
- Transfer of ownership notification
Within 30 days of change in at least 50% ownership, owner shall notify zoning administrator and city council.
- Underground transmission lines preferred
Whenever feasible, onsite transmission or power lines shall be placed underground.
From the ordinance
any battery energy storage system shall be setback three hundred (300) feet from all property lines.