Chatham, Virginia · General provision

Sec. 12D-3

Dimensional standards

Servicing

Geographic extent
Flood plainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions. area for which no detailed flood profiles or elevations are provided, but where a one-hundred (100) year flood plainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions. boundary has been approximated

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Floodplain

  • Floodway delineation requirement

    The applicant within the Approximated Flood Plain District will be required to evaluate the effects of the proposed development on the flood plain and to delineate the floodway based on the requirement that existing and future development not increase the one-hundred (100) year flood elevation more than one foot at any point.

From the ordinance

The applicant within the Approximated Flood Plain District will be required to evaluate the effects of the proposed development on the flood plain and to delineate the floodway based on the requirement that existing and future development not increase the one-hundred (100) year flood elevation more than one foot at any point.
Sec. 12D-3