Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Zoning permit expiration6 months
A zoning permit under which no work is commenced within six months after issuance shall expire by limitation.
- Zoning permit expiration (alternate)12 months
A zoning permit shall expire if the work authorized by the permit is not commenced within twelve (12) months from the date of issuance or if the work authorized is not completed within twenty-four (24) months from the date of issuance.
- Zoning permit required for construction100 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
The erection of a new building that is 100 square feet or more in size.
- Zoning permit required for demolition100 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
It shall not be lawful to remove or to demolish, or to commence the removal or demolition of any building or structure which is 100 square feet or more in size without first filing in writing an application and obtaining a formal zoning permit.
From the ordinance
It shall not be lawful to construct, to alter, or to commence the construction or alteration of a building or structure without first filing in writing an application and obtaining a formal zoning permit from the zoning administrator and a building permit from the building inspector if such construction or alteration involves any of the following: ... The erection of a new building that is 100 square feet or more in size.