Buena Vista, Virginia · General provision

Appendix B, Section A

Extracted standards

10 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Attached garages may set no closer to the street than the front wall of the main structure.

  • Facade articulation interval50 ft

    visible articulation of the mass must occur at a minimum of 50-foot increments

  • Facade articulation required

    Building facades shall be articulated and varied. Primary signs of residential life such as front porches, bays, and balconies shall face the street. In no case will a building be permitted where the street façade is an unarticulated blank wall.

  • Single large buildings meeting or exceeding the sizes set forth below must receive a conditional use permit prior to construction

  • Maximum building footprint as percentage of city block50 pct

    The building footprint of any single structure shall not exceed 50 percent of the area of a city block, without going through the conditional use permitting process.

  • Maximum facade bay length50 ft

    These bays should never exceed 50 feet.

  • Maximum glazing on front elevation75 pct

    The glazing materials on the front elevation of buildings should not exceed 75 percent (50 percent in the mixed business district) of its overall surface area.

  • The glazing materials on the front elevation of buildings should not exceed 75 percent (50 percent in the mixed business district) of its overall surface area.

  • Minimum glazing on ground floor of front elevation50 pct

    The glazing materials on the ground floor of the front elevation of buildings should not be less than 50 percent of its overall surface area.

  • Roofline variation required

    Rooflines shall be varied through the use of a combination of story heights, chimneys, cupolas, dormers, etc.

From the ordinance

The building footprint of any single structure shall not exceed 50 percent of the area of a city block, without going through the conditional use permitting process.