Extracted standards
8 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- Days from permit to start construction180 days
actual start of construction ... was within 180 days of the permit date
- Substantial improvement threshold50 pct
cost of which equals or exceeds 50 percent of the market value
Other
- Maximum consideration to play5 dollars
maximum consideration to play is $5.00
- Maximum duration for churchReligious facilityA building used for organised worship, often with halls and schools attached. or non-profit outdoor sales3 days
temporary outdoor sales conducted by church or non-profit organizations of no more than three days in duration
- Maximum duration for yardYardThe open space left between a building and its lot line — the space a setback creates. sales3 days
no more than three days in duration
- Maximum gross square feetsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000. for temporary family health care structure300 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
has no more than 300 gross square feet
- Maximum winnings per single play5,000 dollars
maximum winnings per a single play does not exceed $5,000.00
- Maximum number of yardYardThe open space left between a building and its lot line — the space a setback creates. sales per calendar year2 count
no more than two yard sales on the same property per calendar year
From the ordinance
Skill game machines shall be programmed so that the maximum consideration to play is $5.00 and the maximum winnings per a single play does not exceed $5,000.00.