Big Stone Gap, Virginia · General provision

Sec. 5.2

Dimensional standards

lot requirementsSTREETbuildable areaSides 25 ft totalMin width 100 ftMIN LOT AREA20,000 sq ftMAX HEIGHT10 ft / 3 storiesMAX LOT COVERAGE50%
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Extracted standards

13 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Height

Lot

Other

  • Principal access from arterial/collector

    The principal means of access for any office or other permitted business use containing more than 2,500 square feet of floor area shall be from arterial and collector thoroughfares.

  • Landscaping of unused areas

    Any part of the lot or project area not used for buildings or other structures, parking, loading and accessways, shall be landscaped with appropriate planting or with pedestrian walks in accord with an approved landscaping plan.

  • Refuse storage hidden from view

    Refuse containers or refuse storage shall be located in a paved area and hidden from general public view, either from within or outside the premises by means of fences, walls, or landscape planting.

  • Site plan approval required

    Site plan approval is required for both new construction or conversion of an existing building.

  • Stormwater drainage provision

    Provision shall be made for proper stormwater drainage. Water from parking and loading areas shall not be permitted to drain onto adjacent property except into a natural watercourse or a drainage easement.

Parking

Signage

From the ordinance

Any use permitted in the R-2 Residential District. 2. Offices and office buildings, business, professional, or administrative...
Sec. 5.2