Big Stone Gap, Virginia · General provision

Section 5

Residential OfficeAll Big Stone Gap districts0

Dimensional standards

lot requirementsSTREETbuildable areaFront 50 ftSides 25 ft totalMin width 100 ftMIN LOT AREA20,000 sq ftMAX HEIGHT3 ftMAX LOT COVERAGE50%
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Permitted by right4

Conditional / special use2

Prohibited1

Extracted standards

16 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Height

Lot

Other

  • Principal access from arterial/collector for buildings >2500 sq ftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.

    The principal means of access for any office or other permitted business use containing more than 2,500 square feet of floor area shall be from arterial and collector thoroughfares.

  • If street is less than fifty (50) feet in width front yard shall be at least fifty (50) feet from the street centerline.

  • Landscaping of unused areas

    Any part of the lot or project area not used for buildings or other structures, parking, loading and accessways, shall be landscaped with appropriate planting or with pedestrian walks in accord with an approved landscaping plan.

  • Loading operations screened

    Loading operations shall be conducted within a building and screened from general public view from fronting streets or shall be conducted at the side or rear of buildings.

  • Refuse storage screened

    Refuse containers or refuse storage shall be located in a paved area and hidden from general public view, either from within or outside the premises by means of fences, walls, or landscape planting.

  • Site plan required for office buildings

    Site plan approval is required for both new construction or conversion of an existing building.

  • Stormwater drainage

    Provision shall be made for proper stormwater drainage. Water from parking and loading areas shall not be permitted to drain onto adjacent property except into a natural watercourse or a drainage easement.

Parking

Signage

From the ordinance

A building or land shall be used only for the following purposes: 1. Any use permitted in the R-2 Residential District. 2. Offices and office buildings...
Section 5