Dimensional standards
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Height
- Maximum heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. above tree line10 ft
height of the tower or facility is not more than ten (10) feet above tree line
Other
- Abandonment period18 months
not operated for a continuous period of eighteen (18) months
- Minimum additional users for towers over 100 ft3 users
compatible for a minimum of three (3) additional users including the primary user
- No-disturbance perimeter easement width25 ft
minimum of twenty-five (25) feet on all sides of the compound
- Removal time after notice90 days
remove the tower or facility within ninety (90) days of receipt of notice
- Screening required
All equipment and facilities related to a telecommunications tower shall be screened in accordance with Sec. 21-236.
Signage
- Maximum sign area on tower4 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
The sign shall not exceed four (4) square feet in size
From the ordinance
The no-disturbance perimeter easement shall provide that disturbance of the wooded area surrounding the proposed telecommunications tower or related facility; however, the no-disturbance perimeter easement shall permit a single means of access...