Ashland, Virginia · General provision

Sec 21-275 and 21-276

Dimensional standards

Extracted standards

7 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Height

Other

  • Abandonment period18 months

    not operated for a continuous period of eighteen (18) months

  • Minimum additional users for towers over 100 ft3 users

    compatible for a minimum of three (3) additional users including the primary user

  • No-disturbance perimeter easement width25 ft

    minimum of twenty-five (25) feet on all sides of the compound

  • Removal time after notice90 days

    remove the tower or facility within ninety (90) days of receipt of notice

  • Screening required

    All equipment and facilities related to a telecommunications tower shall be screened in accordance with Sec. 21-236.

Signage

From the ordinance

The no-disturbance perimeter easement shall provide that disturbance of the wooded area surrounding the proposed telecommunications tower or related facility; however, the no-disturbance perimeter easement shall permit a single means of access...
Sec 21-275 and 21-276