Setback
- Large-scale development arterial setbackSetbackThe distance a building must be held back from a lot line.75 ft
All buildings in a large-scale development shall have minimum setback of 75 feet from the right-of-way of arterial highways, such as U.S. 60 and U.S. 29.
- Large-scale development other setbackSetbackThe distance a building must be held back from a lot line.25 ft
All buildings will have a setback of 25 feet from other street right-of-way lines, or property lines, unless adjacent to a residential district, then the setback shall be 75 feet.
- Large-scale development setbackSetbackThe distance a building must be held back from a lot line. adjacent to residential75 ft
All buildings will have a setback of 25 feet from other street right-of-way lines, or property lines, unless adjacent to a residential district, then the setback shall be 75 feet.
From the ordinance
All buildings in a large-scale development shall have minimum setback of 75 feet from the right-of-way of arterial highways, such as U.S. 60 and U.S. 29. All buildings will have a setback of 25 feet from other street right-of-way lines, or property lines, unless adjacent to a residential district, then the setback shall be 75 feet.