Albemarle County Unincorporated, Virginia · General provision
Sec. 5.1.18
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Duration of temporary construction headquarters and yards30 days
The headquarters shall be authorized on the site for a period beginning no earlier than 30 days prior to the commencement of actual construction and ending no later than 30 days after completion
- Minimum setbackSetbackThe distance a building must be held back from a lot line. of temporary construction yardYardThe open space left between a building and its lot line — the space a setback creates. from preexisting dwelling150 ft
closer than 150 feet to any preexisting dwelling not owned or leased by the owner
- Minimum setbackSetbackThe distance a building must be held back from a lot line. of temporary construction yardYardThe open space left between a building and its lot line — the space a setback creates. from public street right-of-way50 ft
no portion of a yard shall be located: (i) closer than 50 feet to any public street right-of-way
From the ordinance
no portion of a yard shall be located: (i) closer than 50 feet to any public street right-of-way... and (ii) closer than 150 feet to any preexisting dwelling