Albemarle County Unincorporated, Virginia · General provision

Sec. 5.1.65

Uses

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Noise

  • Maximum generator sound level70 dBA

    Generators must be enclosed in a level 3 enclosure or other enclosure limiting sound to 70 dBA measured 23 feet from the generator.

Other

From the ordinance

Data centers must be served by public water and public sewer. Any water cooling must use a closed loop or recycled water system. Data center buildings and all associated equipment and accessory structures must be set back at least (i) 200 feet from all lot lines and (ii) 500 feet from the Rural Areas zoning district.
Sec. 5.1.65