Sec. 4.14.3
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Certified engineer's report required for industrial uses
Prior to the issuance of a zoning clearance or approval of a final site plan, each prospective occupant of a use of an industrial character shall submit a certified engineer's report...
- Compliance with FAA regulations for electrical disturbance
Any electrical disturbance that would adversely affect the navigation or control of aircraft shall comply with the current regulations of the Federal Aviation Administration.
- Intense glare operations must be enclosed
Any operation producing intense glare as determined by the zoning administrator shall be performed only within a completely enclosed building and in such a manner so as not to create a public nuisance or hazard to abutting parcels.
- Maximum temperature increase at abutting lot boundary1 F
Any operation producing the emission of heat which would cause a temperature increase of one degree Fahrenheit (1º F) or greater as measured at or beyond the closest boundary line of an abutting lot shall be performed only within a completely enclosed building...
- No electrical disturbance adversely affecting other lots
No electrical disturbance generated from a use of an industrial character shall adversely affect any activity, including the use of any machinery or equipment, on any other lot.
- Vents oriented away from abutting lots in RA or residential districts
Vents, chimney stacks and other devices for emitting heat or heated air from a building shall be oriented away from abutting lots within the rural areas (RA) or any residential zoning district.
From the ordinance
Any operation producing intense glare as determined by the zoning administrator shall be performed only within a completely enclosed building...