Albemarle County Unincorporated, Virginia · General provision

Sec. 6.3

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Continuation allowed

    A nonconforming structure may be continued

  • Damage threshold50 pct

    If a nonconforming structure is damaged or destroyed to an extent exceeding 50 percent of its replacement value, the nonconforming structure shall not be reconstructed

  • A nonconforming structure shall not be expanded, enlarged, or extended

  • Maintenance/repair allowed

    A nonconforming structure may be maintained and repaired, provided that the maintenance and repair does not increase the nonconformity

  • Repair timeframe12 months

    reconstruction is commenced within 12 months and completed within 24 months after the date of the damage or destruction

From the ordinance

A nonconforming structure may be continued, subject to the requirements of this section. A nonconforming structure may be maintained and repaired, provided that the maintenance and repair does not increase the nonconformity. A nonconforming structure shall not be expanded, enlarged, or extended, except as otherwise provided in this ordinance. If a nonconforming structure is damaged or destroyed to an extent exceeding 50 percent of its replacement value, the nonconforming structure shall not be reconstructed, except as otherwise provided in this ordinance. If a nonconforming structure is damaged or destroyed to an extent not exceeding 50 percent of its replacement value, the nonconforming structure may be reconstructed, provided that the reconstruction is commenced within 12 months and completed within 24 months after the date of the damage or destruction.
Sec. 6.3