Albemarle County Unincorporated, Virginia · General provision

Sec. 5.1.26

Dimensional standards

lot requirementsSTREETMIN LOT AREA10 ac
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

From the ordinance

Hydroelectric power generation shall be permitted only as authorized by special use permit under section 33.5, and shall comply with the following requirements: a. The hydroelectric power generation facility shall comply with the requirements of the Federal Energy Regulatory Commission and the Virginia Department of Environmental Quality. b. The hydroelectric power generation facility shall be located on a lot of not less than 10 acres. c. The hydroelectric power generation facility shall be located not less than 100 feet from any lot line.
Sec. 5.1.26