Albemarle County Unincorporated, Virginia · General provision
Sec. 32.8.6
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- Dam break inundation zone development requirement50 pct
The developer must pay 50 percent of the contract-ready costs for necessary upgrades to an impounding structure attributable to the development, together with an administrative fee as provided in County Code Chapter 1, Article 5.
From the ordinance
Following the completion of the engineering studies in accordance with Virginia Code § 15.2-2243.1(A) and the determination by the Virginia Department of Conservation and Recreation that the developer's plan of development would change the spillway design flood standards of the impounding structure, before any development within a dam break inundation zone: