Accomack County Unincorporated, Virginia · General provision

Sec. 106-386 through 106-389

Dimensional standards

Servicing

Geographic extent
Chesapeake Bay Watershed and Atlantic Ocean Watershed

Extracted standards

10 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • The following land development in the RPA shall be exempted from the buffer area requirements of the CAPA Overlay District, to the extent necessary to provide a building envelope no greater than 3,500 square feet...

  • Construction, installation, operation, and maintenance of electric, natural gas, fiber optic and telephone transmission lines, railroads, and public roads ... are exempt.

  • Exemptions in the RPA

    The following land disturbances in the RPA may be exempted from the 100-foot RPA buffer protection requirements: water wells; passive recreation facilities such as boardwalks, trails, and pathways; and historic preservation and archaeological activities...

  • Exemptions for silvicultural activities

    Silvicultural activities are exempt from the requirements of this article provided that silvicultural operations adhere to water quality protection procedures prescribed by the Virginia Department of Forestry...

  • A major water quality impact assessment shall be required for any development which (i) exceeds 10,000 square feet of land disturbance within the RPA and involves any encroachment into the 100-foot buffer; (ii) causes less than 10,000 square feet of land disturbance within the RPA and involves any encroachment into the waterward 50 feet of the 100-foot buffer; ...

  • A minor water quality impact assessment pertains to land disturbances and development within RPAs that causes no more than 10,000 square feet of land disturbance and requires any encroachment into the landward 50 feet of the 100-foot buffer.

  • The lawful use of a building or structure which existed on October 1, 1989 within the Chesapeake Bay Watershed or which existed on February 18, 2009, in Atlantic Ocean Watershed, and which building or structure is not in conformity with this article, may be continued...

  • RPA buffer width100 ft

    100-foot RPA buffer

  • Seaward buffer width50 ft

    50-foot seaward RPA buffer

  • Water quality impact assessment required

    A water quality impact assessment is required for any proposed development within a RPA, including any buffer modification or encroachment.

From the ordinance

A water quality impact assessment is required for any proposed development within a RPA, including any buffer modification or encroachment.
Sec. 106-386 through 106-389