Accomack County Unincorporated, Virginia · General provision

Tower regulations

Extracted standards

16 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Abandonment period24 months

    Any antenna or tower that is not operated for a continuous period of 24 months shall be considered abandoned.

  • Landscaping buffer width4 ft

    The standard buffer shall consist of a landscaped strip at least four-feet wide outside the perimeter of the facilities.

  • Building code compliance

    To ensure the structural integrity of towers, the owner of a tower shall ensure that it is maintained in compliance with standards contained in applicable federal, state, and local building codes and regulations.

  • Change of status report

    The owner of any tower that required a special use permit under these regulations for which a change of user status occurs, shall submit a report to the Accomack County Department of Building, Planning and Zoning.

  • Collapse within lot lines

    Towers shall be designed to collapse within the lot lines or lease lines, if leased area does not conform to property lot lines, in case of structural failure.

  • Availability of suitable existing towers

    No new tower shall be permitted unless the applicant demonstrates that no existing tower or structure can accommodate the applicant's proposed antenna.

  • FAA/FCC compliance

    All towers must meet or exceed current standards and regulations of the FAA, the FCC, and any other agency of the federal government with the authority to regulate towers and antennas.

  • The board of zoning appeals shall consider the following factors: height, proximity to residential structures, nature of adjacent uses, topography, tree coverage, design, ingress/egress, co-location policy, lease agreement, consistency with comprehensive plan, availability of existing towers, VDOA approval.

  • Each applicant requesting a special use permit under this chapter shall submit the following: owner authorization, specifications, site plan, visual impact analysis, antenna owners, need justification, inventory of existing sites, propagation maps, co-location policy, engineering report, notice to adjoining property owners, FCC license, VDOA approval.

  • Local government access

    Owners of towers may provide the county co-location opportunities as a community benefit to improve radio communication for county departments and emergency services.

  • To permit co-location, the tower shall be designed and constructed to permit extensions to a maximum height of 199 feet.

  • Removal time after notice90 days

    The owner of each such antenna or tower shall remove same within 90 days of receipt of notice from the county.

  • Towers shall be enclosed by security fencing not less than six feet in height and shall also be equipped with an appropriate anti-climbing device.

  • The tower must be set back from any off-site residential structure no less than 400 feet.

  • Tree removal distance from tower200 ft

    Existing trees within 200 feet of the tower shall not be removed except as may be authorized to permit construction of the tower and installation of access for vehicle utilities.

  • VDOA review

    Towers and antennas proposed to penetrate above any Federal Aviation Regulations (FAR) Part 77 surface pertaining to the Accomack County Airport or the Wallops Island Airport shall be submitted to the VDOA for review and approval.

From the ordinance

To permit co-location, the tower shall be designed and constructed to permit extensions to a maximum height of 199 feet.
Tower regulations