Dimensional standards
Lot
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Height
- HeightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. increase requires yardYardThe open space left between a building and its lot line — the space a setback creates. increase2 ft per ft over 45
The maximum height may be increased provided each required yard (side, rear, or buffer) adjoining a residential district or use is increased by two feet above the minimum for each foot in height over 45 feet.
Other
- All structures must be fully enclosed
Every structure in a PTD shall be a fully enclosed building of permanent construction. Any outside storage area shall be fully screened so that no materials so stored are visible at any lot line or public right-of-way.
- Minimum buffer width adjoining residential10 ft
In no case shall a buffer screening area adjoining any residential district or use be less than 10 feet in width.
- Utilities underground
Utilities shall be underground unless the type of service necessary for normal activities of the industry or business shall prohibit installation.
From the ordinance
Minimum frontage and lot width: None. The maximum height may be increased provided each required yard (side, rear, or buffer) adjoining a residential district or use is increased by two feet above the minimum for each foot in height over 45 feet. In no case shall a buffer screening area adjoining any residential district or use be less than 10 feet in width. Public water and sewer services are required in the PTD.