Section 7-2-19 Family health care structure, temporary
Dimensional standards
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Comply with all yardYardThe open space left between a building and its lot line — the space a setback creates. requirements for primary structure
Such structures shall comply with all yard requirements that apply to the primary structure.
- Maximum gross square feetsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.300 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
The structure shall be no more than 300 gross square feet and shall comply with all applicable provisions of the Industrialized Building Safety Law (§ 36-70 et seq.), and the Uniform Statewide Building Code (§ 36-97 et seq.).
- Only one family health care structure per lot1 structure
Only one family health care structure shall be allowed on a lot or parcel of land.
- Permit required
Prior to installing a temporary family health care structure, a permit must be obtained from the Town and associated fees paid.
- Removal within 60 days of last occupancy60 days
Any temporary family health care structure shall be removed within 60 days of the date on which the temporary family health care structure was last occupied by a mentally or physically impaired family member receiving services or assistance.
Signage
- No signage permitted
No signage shall be permitted on the exterior of the structure or anywhere on the property.
From the ordinance
The structure shall be no more than 300 gross square feet and shall comply with all applicable provisions of the Industrialized Building Safety Law and the Uniform Statewide Building Code.