Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Allowed in any districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2.
Temporary construction trailers and temporary buildings, used in conjunction with construction work only and not for residential occupancy, may be permitted in any district during the period construction work is in progress.
- DistrictZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2. yardYardThe open space left between a building and its lot line — the space a setback creates. requirements
All yard requirements of the district for a principal structure in which the temporary building or construction trailer is located shall be met.
- Permit duration12 months
A temporary permit is issued for a period of 12 months only upon showing by the applicant of a valid and approved building permit... Such temporary permit may be renewed for a maximum of an additional 12 months...
From the ordinance
Temporary construction trailers and temporary buildings, used in conjunction with construction work only and not for residential occupancy, may be permitted in any district during the period construction work is in progress.