Abingdon, Virginia · General provision

Section 7-2-33

Dimensional standards

Extracted standards

7 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Design

Height

Other

  • Decommission plan required

    All applications for a medium-scale solar energy facility shall require a decommission and reclamation plan.

  • Regardless of whether a medium-scale solar facility is accessory to another use on the lot, all medium-scale solar facilities shall comply with the district's principal structure setbacks.

  • Landscaping and screening

    Landscaping and screening shall be provided for ground mounted solar to block visibility of the panel(s) and ancillary equipment from adjacent properties.

  • Underground wiring

    All wiring not on the solar arrays shall be underground except where necessary to connect to the public utility.

From the ordinance

If the medium-scale solar energy facility is ground-mounted or not flush-mounted on a principal or accessory building, the facility's height shall not exceed 15 feet at the tallest point.
Section 7-2-33