Abingdon, Virginia · General provision

Section 8-5-4

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • ESM plan required

    A person shall not conduct any land-disturbing activity in the Town until an application that includes a permit registration statement, if required, a soil erosion control and stormwater management plan or an executed agreement in lieu of a plan, if required, has been submitted to the Town.

  • Land-disturbing activity that disturbs 10,000 square feet or more, is less than one acre, not in an area of a locality designated as a Chesapeake Bay Preservation Area, and not part of a common plan of development or sale, is subject to criteria defined in Article 2 (9VAC25-875-540 et seq.) of Part V of the Virginia Erosion and Stormwater Management Regulation (Regulation).

  • Responsible Land Disturber certificate required

    The name of the individual who will be assisting the owner in carrying out the activity and holds a Responsible Land Disturber certificate pursuant to § 62.1-44.15:30 of the Code of Virginia is submitted to the Town.

From the ordinance

Land-disturbing activities that meet one of the criteria below are regulated as follows: (1) Land-disturbing activity that disturbs 10,000 square feet or more, is less than one acre, not in an area of a locality designated as a Chesapeake Bay Preservation Area, and not part of a common plan of development or sale, is subject to criteria defined in Article 2 (9VAC25-875-540 et seq.) of Part V of the Virginia Erosion and Stormwater Management Regulation (Regulation).
Section 8-5-4