Extracted standards
16 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Backup generator maintenance/cycling duration30 minutes
Permittee shall not operate the generator for maintenance/cycling more frequently than twice per month and then only for no longer than 30 minutes at a time on Wednesdays between 10:00 a.m. and 11:00 a.m.
- Backup generator maintenance/cycling frequency2 times per month
Permittee shall not operate the generator for maintenance/cycling more frequently than twice per month and then only for no longer than 30 minutes at a time on Wednesdays between 10:00 a.m. and 11:00 a.m.
- Build-out period1 year
Any permit approved under this Article or by operation of law shall automatically expire one (1) year from the approval date if the applicant fails to commence construction within that one-year period; provided, however, that the Zoning Administrator may renew any such permit for up to one (1) additional year if the Zoning Administrator receives a written request from the permittee within thirty (30) days prior to the expiration date, at the Zoning Administrator's sole discretion.
- Substantial change concealment defeat
Would defeat the existing concealment elements of the support structure as determined by the Approval Authority
- Substantial change equipment cabinet threshold for towers on private property4 cabinets
For towers on private property, involves the installation of more than the standard number of equipment cabinets for the technology involved, not to exceed four
- Substantial change equipment cabinet threshold for towers in public rights-of-way and base stations
For towers in the public rights-of-way and base stations, involves the installation of (i) any new equipment cabinets on the ground when there are no existing ground-mounted equipment cabinets, or (ii) any new ground-mounted equipment cabinets that are 10 percent larger in height or volume than any existing ground-mounted equipment cabinets
- Substantial change excavation threshold for towers on private property
For towers on private property, involves excavation outside the current boundaries of the leased or owned property surrounding the wireless tower, including any access or utility easements currently related to the site
- Substantial change excavation threshold for towers in public rights-of-way and base stations
For towers in the public rights-of-way and base stations, involves excavation or deployment of equipment outside the area in proximity to the structure and other transmission equipment already deployed on the ground
- Graffiti removal time48 hours
Permittee shall promptly remove any graffiti on the wireless facility at permittee's sole expense, and in no instance more than 48 hours from the time of notification by the City or after discovery by the permittee.
- Substantial change heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. increase threshold for towers on private property
Increases the overall height more than either (i) 10 percent or the height of one additional antenna array not to exceed 20 feet (whichever is greater) for towers on private property
- Substantial change heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. increase threshold for towers in public rights-of-way and base stations
Increases the overall height more than either (i) 10 percent or 10 feet (whichever is greater) for towers in the public rights-of-way and base stations
- Maintenance requirement
The site and the facility, including but not limited to all landscaping, fencing and related transmission equipment, must be maintained in a neat and clean manner and in accordance with all approved plans and conditions of approval.
- No extension of underlying permit duration
The City's grant or grant by operation of law of a Section 6409(a) Approval constitutes a federally-mandated modification to the underlying permit or approval for the subject tower or base station. The City's grant or grant by operation of law of a Section 6409(a) Approval will not extend the permit term for any conditional use permit, land use permit or other underlying regulatory approval and its term shall be coterminous with the underlying permit or other regulatory approval for the subject tower or base station.
- Substantial change prior condition violation
Violates a prior condition of approval, provided however that the collocation need not comply with any prior condition of approval related to height, width, equipment cabinets or excavation that is inconsistent with the thresholds for a substantial change
- Substantial change width increase threshold for towers on private property
Increases the width more than either (i) 20 feet or the width of the tower at the level of the appurtenance (whichever is greater) for towers on private property
- Substantial change width increase threshold for towers in public rights-of-way and base stations
Increases the width more than either (i) 6 feet from the edge of the support structure for towers in the public rights-of-way and base stations
From the ordinance
Any request to collocate, replace or remove transmission equipment at an existing wireless tower or base station submitted for approval under Section 6409(a) shall require a Section 6409(a) Approval subject to the Zoning Administrator's approval, conditional approval or denial under the standards and procedures contained in this Section.