Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Signage
- Multiple temporary sign permit required if count25 signs
Any person seeking to erect on one or more sites or to distribute 25 or more temporary signs at one time
- Multiple temporary sign removal period90 days
All temporary signs and structures are to be removed within 90 days from the date the permit is issued.
From the ordinance
All temporary signs and structures are to be removed within 90 days from the date the permit is issued.