Richmond, California · General provision

15.04.606.070

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Maximum structural repair cost50 pct

    Structural repairs may be undertaken when cost does not exceed 50% of replacement cost within 12 months.

From the ordinance

Structural repairs may be undertaken when the cost of such work does not, within a 12-month period, exceed 50 percent of the replacement cost of the nonconforming structure.
15.04.606.070