Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum structural repair cost50 pct
Structural repairs may be undertaken when cost does not exceed 50% of replacement cost within 12 months.
From the ordinance
Structural repairs may be undertaken when the cost of such work does not, within a 12-month period, exceed 50 percent of the replacement cost of the nonconforming structure.