Other
- YardYardThe open space left between a building and its lot line — the space a setback creates. measurement
The required least depth or width of any yard shall be measured at right angles to the parcel line adjoining except as provided.
- YardYardThe open space left between a building and its lot line — the space a setback creates. measurement from special building setbackSetbackThe distance a building must be held back from a lot line. line
Where special building setback lines have been established, such lines shall control the placement of structures in lieu of the yards otherwise required in the zoning district.
- YardYardThe open space left between a building and its lot line — the space a setback creates. measurement from vehicular access easement
Where an easement for vehicular access traverses all or a portion of a parcel, the required least depth or width of yard shall be measured from such easement.
- YardYardThe open space left between a building and its lot line — the space a setback creates. measurement from future street right-of-way
Where any future street right-of-way lines have been established by any specific plan for future street opening or widening, the required least depth or width shall be measured from such planned street right-of-way lines.
From the ordinance
Except as provided in this chapter, every structure shall be upon a parcel of such dimensions in relation to the structure as to provide for yards as specified in Tables 1 and 2 of Section 18.48.010 or the district in which the parcel is located.