- Conditions may be imposed
In granting any conditional use permit, the planning commission may impose such conditions and requirements as are deemed necessary to carry out the purposes of this title and to protect the public health, safety, and welfare. Such conditions may include, but are not limited to, the following: A. Limitations on the manner in which the use may be conducted... B. Requirements for screening, fencing, or landscaping... C. Requirements for lighting... D. Requirements for noise control... E. Requirements for the provision of off-street parking and loading... F. Requirements for the provision of public improvements... G. Requirements for the establishment of a time limit... H. Requirements for the posting of a performance bond... I. Requirements for the dedication of land... J. Requirements for the recordation of covenants... K. Requirements for the establishment of a property owners association... L. Requirements for the maintenance of landscaped areas... M. Requirements for the protection of natural resources... N. Requirements for the protection of cultural resources... O. Requirements for the mitigation of geologic, seismic, and flood hazards... P. Requirements for the provision of adequate emergency access and fire protection.
- Findings required for approval
The planning commission shall not grant a conditional use permit unless it makes all of the following findings: A. The proposed use is consistent with the general plan... B. The proposed use is consistent with the zoning ordinance... C. The proposed use will not be detrimental... D. The proposed use is compatible... E. The site is physically suitable... F. The proposed use will not create significant traffic, parking, noise... G. The proposed use complies with all applicable provisions of this title...
- Lapse of permit
If no time limit is established as provided under paragraph A (11) of Section 18.72.140 or Section 18.72.210, Section 18.34.140 shall govern.
- New application restriction after denial/revocation1 year
Following the denial or revocation of a conditional use permit, no application for a conditional use permit for the same or substantially the same conditional use on the same or substantially the same site shall be filed within one year from the date of denial or revocation of such conditional use permit.
- Conditional useConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote. permit review required
The uses listed as conditional uses are declared to be uses possessing characteristics of such unique and special qualities as to require special review to determine whether or not any such use should be permitted in a specific location which may be proposed.
- Time limit for development
The planning commission may establish a time limit within which the subject property and use shall be developed. The time limits set by the planning commission shall be reasonable, based upon the size and nature of the proposed development.
From the ordinance
A conditional use permit may be authorized by the planning commission for any conditional use listed in this title.