Extracted standards
34 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Antenna diameter range requiring review4 ft
antennas with diameters larger than four feet but not exceeding six feet
- Appeal must be filed within days15 days
appeal must be filed within fifteen days
- Approval expiration if permit not issued2 years
approvals of building permits shall expire if the permit has not been issued within two years
- Structures on parcels fronting arterial roads require review
structures on parcels fronting on arterial roads, expressways or freeways
- All commercial buildings require review
Applications for building permits for all commercial buildings
- Commission action within days15 days
The architectural and site control commission shall meet and act on such applications within fifteen days
- Conditional useConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote. permits require review except interior alterations
Applications for conditional use permits except when such permits are for interior alterations only
- Planting and site design for drainage and erosion
Planting and site design as related to problems of drainage and soil erosion
- Effective date after approval16 days
Building permits approved by the architectural and site control commission shall become effective sixteen days after approval
- Entryway features require review
entryway features
- GradingGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. to minimize disturbance
Grading so as to minimize the apparent disturbance to the natural terrain
- Properties with historicHistoric districtAn area where exterior changes need design review to protect its character. resources require review
properties with historic resources as identified in the historic element of the general plan
- Landscaping, screening, fencing for privacy
Landscaping, screening, and fencing to preserve privacy
- Adequate light and air
Design and location of the structure in relation to provision of adequate light and air
- Lighting requires review
lighting
- Mail boxes require review
mail boxes
- Materials and colors compatible with rural setting
Materials and colors shall be compatible with the rural setting
- Minimize disturbance to natural terrain
Design of the structure so as to minimize disturbance to the natural terrain
- Night lighting arrangement
Arrangement and intensity of night lighting in relation to public safety
- Restoration/reconstruction of nonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. buildings require review
restoration or reconstruction of nonconforming buildings
- Mail notification days before meeting6 days
Notification shall be sent by mail at least six days prior to the meeting
- Phone notification days before meeting4 days
Alternatively, such notification can be by telephone at least four days prior to the meeting
- Town planner may require review for any building
buildings or additions of any size that the town planner determines is appropriate
- Maximum possible preservation of existing vegetation
Maximum possible preservation of existing vegetation
- Recycling and trash enclosures require review
recycling and trash enclosures
- Minimum building size requiring review400 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
buildings or additions of four hundred square feet or larger
- Minimum storiesStoreysHabitable floor levels. Whether a basement or attic counts is defined by the local code. requiring review2 storiesStoreysHabitable floor levels. Whether a basement or attic counts is defined by the local code.
two stories or more
- Nonresidential structures compatible with rural atmosphere
Nonresidential structures shall be compatible with the rural atmosphere of Portola Valley
- SB 9 dwelling unitsDwelling unitOne independent home: its own kitchen, bathroom and entrance. exempt from architectural review
Applications for design review of SB 9 dwelling units shall be exempt from the architectural and site plan review process
- Structures in areas of influence in specific plans require review
structures in any area which has been designated as an area of influence in any specific plan
- Street dedication required
All streets ... shall be dedicated to the full width required by the town
- Tennis courts and paddle tennis courts require review
Zoning permits for tennis courts and paddle tennis courts
- Entrances/exits and circulation for traffic safety
Location of entrances and exits and layout of internal circulation in relation to traffic safety
- Uncovered parking requires review
uncovered parking
From the ordinance
Architectural and site plan review shall be required in connection with matters listed in this section; ...