17.54.130
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
The front setback is measured at right angles to the front property line or edge of easement, whichever is greater. The street-side setback is measured at right angles to the property line or edge of easement, whichever is greater. Rear setbacks are measured at right angles to the rear property lines. Side setbacks are measured at right angles to the side property lines.
- SetbackSetbackThe distance a building must be held back from a lot line. conflict resolution priority
In the event of any conflicts between the setback requirements within this chapter or any conflicts between this chapter and other laws, codes, ordinances, etc., the order of priority for applying the setback requirements shall be as follows: 1. Applicable laws of the state of California... 13. The setbacks established for each zone by Sections 17.06.060 et seq.
- Structures prohibitedProhibitedNot allowed in the district at all, short of rezoning or a variance. in setbacksSetbackThe distance a building must be held back from a lot line.
No structure (including main or accessory buildings, building projections, enclosed or unenclosed decks, or any other structure) shall be permitted within any required setback area, except for: 1. Underground utilities and septic tanks; 2. Fences pursuant to Section 17.54.030; 3. Signs pursuant to Section 17.54.170 et seq.; 4. Propane tanks as provided by the California Fire Code...
From the ordinance
Required setbacks describe areas on lots where no buildings, structures, or additions to them may be located, and which thereby become yard areas.