ARTICLE 12 - INDUSTRIAL, GENERAL, DISTRICT I-2#I-2
Sec. 22-12-1. - Statement of intent.#
The primary purpose of this district is to establish an area as defined by the Comprehensive Plan where the principal use of land is for heavy commercial and industrial operations, which may create some nuisance, and which are not properly associated with, nor particularly compatible with, residential, institutional, and neighborhood commercial service establishments. The specific intent of this district is to:
(A) Encourage the construction of and the continued use of the land for heavy commercial and industrial purposes;
(B) Prohibit residential and neighborhood commercial use of the land and to prohibit any other use which would substantially interfere with the development, continuation or expansion of commercial and industrial uses in the district;
(C) To encourage the discontinuance of existing uses that would not be permitted as new uses under the provisions of this ordinance.
Sec. 22-12-2.1. - Uses permitted by right.#
The following uses shall be permitted by right:
Civic Uses
- Public uses
Commercial Uses
- Corporate offices
- Machinery sales and service
- Transportation terminals
- Vehicle impound facilities
Industrial Uses
- Contractor's storage yards
- Data centers
- Lumberyards
- Machine shops
- Manufacturing, light
- Manufacturing, medium
- Railroad facilities
- Research laboratories
- Sawmills, permanent
- Sawmills, temporary
- Solid waste collection facilities
- Truck terminals
- Upholstery shops
- Wholesale warehouses
Miscellaneous Uses
- Accessory uses
- Mobile food unit
- Small scale solar generation facility
- Utilities, major
- Utilities, minor
- Wood storage, temporary
(Ord. 9-17-08; Ord. 10-21-09; Ord. 11-3-10; Ord. of 09-15-2021 (1); Ord. of 08-17-2022 (1); Ord. of 09-17-2025(3), § 1)
Sec. 22-12-2.2. - Uses permitted by special use permit.#
The following uses shall be permitted by special use permit only:
Commercial Uses
- Manufactured home sales
- Medical clinics
- Offices
- Shooting ranges, indoor
- Shooting ranges, outdoor
Industrial Uses
- Manufacturing, heavy
- Petroleum distribution facilities
- Resource extraction
- Salvage and scrap yards
- Sanitary landfills
- Slaughterhouses
- Solid waste material recovery facilities
Miscellaneous Uses
- Aviation facilities
- Minor scale solar generation facility
- Telecommunication facilities
- Utility scale solar generation facility
(Ord. 9-17-08; Ord. 10-21-09; Ord. 11-3-10; Ord. of 09-15-2021 (1); Ord. of 03-20-2024 (2))
Sec. 22-12-3. - Requirements for permitted uses.#
(A) Before a zoning permit shall be issued or construction commenced on any permitted use in this district, or a permit issued for a new use, the applicant for the proposed use shall comply with the provisions of Article 23 of this chapter.
(B) Screening from adjacent business, residential and agricultural district shall be required.§
(C) Landscaping may be required within any established or required front setback area.§ The plans and execution must take into consideration traffic hazards.
Sec. 22-12-4. - Area regulations.#
For permitted uses utilizing individual sewage disposal systems, the required area for any such use shall be approved by the health official. The administrator may require a greater area if considered necessary.
Sec. 22-12-5. - Setback regulations.#
Buildings shall be located not less than 200 feet from any street right-of-way, except that:
(A) Buildings and accessory uses may be located less than 200 feet from a street right-of-way, provided that said street:
(1) Is an access road within a subdivision for business or industrial uses and serves properties that contain industrial zoning district classifications only;
(2) Is a cul-de-sac or an interior road; and
(B) All buildings, structures and parking lots shall be located not less than 25 feet from any street right-of-way.§
The foregoing notwithstanding, the location of buildings and accessory uses shall at all times be located so as to provide safe and efficient access to, from and within the property, including sight distance, and turning, stacking and other traffic circulation features and facilities.
This shall be known as the "setback line."
(Ord. of 07-09-2019 (1))
Sec. 22-12-6. - Yard regulations.#
When permitted uses adjoin I-1 or I-2 districts, there shall be no minimum side yard requirement except as otherwise required by law. When permitted uses adjoin A-1, R-1, R-2, R-3, R-4, PRD, PUD, B-1 and C-1 districts the minimum yard requirements shall be fifty feet (50').§ The foregoing notwithstanding, there shall be no minimum side yard requirement for any property adjacent to a property owned by the Virginia Department of Corrections.
(Ord. 6-21-17)
Sec. 22-12-7. - Height regulations.#
Buildings may be erected up to seventy feet (70') in height from grade, except that:
(A) Spires, belfries, cupolas, monuments, water towers, chimneys, flues, flagpoles, television antennae, and radio aerials are exempt. Parapet walls may be up to four feet (4') above the height of the building on which the walls rest.§
(B) Any structure seeking to exceed a height of 70 feet must obtain a special use permit for that height exemption.§
(Ord. 6-21-17)
Sec. 22-12-8. - Coverage regulations.#
Buildings or groups of buildings with their accessory buildings may cover up to sixty percent (60%) of the area of the lot. Additional coverage may be permitted by the governing body.
Sec. 22-12-9. - Off-street parking.#
Off-street parking shall conform with Article 26: Off-Street Parking and Loading Spaces of this chapter.
(Ord. 12-16-15).
Sec. 22-12-10. - Sign regulations.#
Sign regulations shall conform with Article 15 of this chapter.
Sec. 22-12-11. - Sidewalks.#
Sidewalks that comply with the most recent VDOT specifications shall be required on both sides of all roadways, public and private.§
Exceptions approved by the Planning Commission for locating sidewalks along road frontage may be acceptable with the placement of a trail network or greenway on the property providing sufficient pedestrian circulation.
(Ord. 5-4-11)